Scope of Work

Exterior Door Closure & Wood Shingle Installation

1. Site Preparation: Protect surrounding areas and prepare the work area for construction.

2. Door Removal: Carefully remove the existing exterior door and necessary components.

3. Wood Framing: Construct a new wood frame using 2×4 lumber to permanently close the door opening.

4. Insulation Installation: Install insulation within the new wall framing for thermal protection.

5. Exterior Sheathing: Install OSB or plywood sheathing to create a solid exterior surface.

6. Weatherproofing: Install house wrap, flashing tape, and appropriate sealing materials to prevent moisture intrusion.

7. Wood Shingle Installation: Install cedar wood shingles over the designated exterior area to match the existing siding.

8. Exterior Painting: Apply primer and exterior paint to match the existing house color and finish.

9. Final Inspection & Cleanup: Inspect the completed work, remove construction debris, and leave the work area clean.

Notes

– Work is subject to verification of existing structural conditions and applicable building and egress requirements.
– Any additional structural repairs or unforeseen conditions will be discussed with the homeowner before proceeding.
– Interior wall finishing is not included unless otherwise specified.